view_timelineCadence Flow APS Engine

Intelligent Scheduling. Optimized Production. Measurable Results.

Combining AI Intelligence and Heuristic Optimization for Smarter Scheduling

view_timelineTry Live Gantt Simulator
Industrial Plant Operations Control Dashboard
Solver Telemetry
Strict Finite Optimization
ONLINE • < 4.2s
< 4.2s
Solve Latency
-42.6%
Cleanout Waste
100%
Finite Feasible
Live Dispatch Simulation

Live Gantt Demo

Production Line
08:00 - 10:30
10:30 - 13:00
13:00 - 16:00
Packaging Line A1
SKU-4820 (Chocolate 500g)
Batch #902 • 45,000 Units • 98.4% Pace
CIP Clean
25m Dry
SKU-9182 (Peanut Butter Crisp)
Batch #903 • Tail-end Allergen Sequence
Carton Cell B2
Box Folding #12
Paced to Line A1
Multipack Bundle #44
32,000 cases • Palletized direct to dock
Buffer
Liquid Filler C1
Saline 100ml Campaign
Sterile Holding Window: 18h Remaining
Steam CIP
Caustic
Ringer Lactate 250ml
Campaign Run #41
100% Finite Feasible Plan • 0 Over-Capacity Violations • Crew Matched
Finite CP-SAT Solver Runtime: 3.8s
Algorithmic Core

Key Capabilities

smart_toy
Autonomous AI

Intelligent Scheduling Agent

Provably optimal schedules, not guesses.

shuffle
-42% Washdown Time

Sequence-Dependent Setup Matrices

Fewer changeovers and cleanouts.

badge
Zero Over-Commit

Strict Finite Capacity & Crew Balancing

Machines, crews and tooling in one plan.

sync_alt
Real-Time Sync

Bi-Directional ERP & MES Telemetry

Syncs with your ERP and shop floor.

bolt
< 5s Latency

Sub-Second Disruption Re-Solve

Instant re-plan on breakdowns and rush orders.

psychology
Feasibility Guard

Explainable Industrial AI Governance

Plain-language explanations of every trade-off.

Factory Topologies

Production Lines We Schedule

FMCG & Packaged Goods
FMCG & Packaged Goods-42.6% Allergen Washdown

High-speed packaging lines.

Pharma & Life Sciences
Pharma & Life SciencesZero Hold-Time Decay

Regulated batch and campaign production.

Food and Beverages
Food and Beverages100% Shelf-Life Feasible

Tank, filler and shelf-life planning.

PAKISTAN INDUSTRY FINANCIAL MODEL

Plant ROI & Capacity Recovery Calculator

Calibrated for manufacturing economics across Karachi, Lahore, Faisalabad, and Hub industrial zones.

Select Your Manufacturing Sector Preset:

Facility Operating Parameters

Adjust to match your plant topology.

6 Lines
1 line15 lines30 lines
2 Shifts (16h)
1 (8h)2 (16h)3 (24/7 continuous)
8 Setups / Wk
2 setups12 setups24 (high SKU mix)
₨ 65,000 / hr
₨ 15k/hr (Light)₨ 100k/hr₨ 250k/hr (Heavy Process)

*Includes peak electricity tariffs (K-Electric/LESCO), captive generator diesel, operator labor & lost production contribution.

PAKISTAN FINANCIAL RECOVERY BENCHMARKCP-SAT Optimization Model
Annual Cost Saved
₨ 11.03 Crore
₨ 110,305,000 PKR / year
Payback Period
0.4 Mo
Based on ₨ 35 Lacs pilot benchmark
Net Capacity Freed
+1,697h
Reclaimed line hours / year
OEE YIELD GAIN
+6.8%
Equivalent to ~1 extra operational shift every month
SCHEDULER TIME SAVED
16.5 Hrs/wk
Zero Excel chaos & shift WhatsApp firefighting
IDLE ENERGY SAVINGS
₨ 3.31 Crore
Power/genset diesel saved during changeovers
Integrations

Connects to Your Systems

SAP S/4HANA & ECCOracle NetSuiteMicrosoft Dynamics 365Plex MESAVEVA WonderwareIgnition OPC-UA
Telemetry Handshake Pipeline
download
1. Inbound: Orders
From your ERP.
memory
2. Optimize
Optimal plan in seconds.
upload
3. Dispatch
To the shop floor.
Closed-Loop Digital Twin & Industrial AI Optimization Network
DIGITAL TWIN TELEMETRYOR-TOOLS V9.8
How It Fits

Closed-Loop Autonomous Planning

Seamlessly bridges shop-floor telemetry with industrial AI solvers. When micro-stoppages occur or line bottlenecks shift, our closed-loop digital twin re-optimizes production schedules in sub-seconds.

sensorsClosed-Loop Telemetry
Real-time shop floor event detection & live feedback
dynamic_feedDisruption Resiliency
Autonomous schedule recovery under dynamic constraints

Ready to Eliminate Shop-Floor Schedule Fiction?

Book a demo or send us a sample schedule.

Contact Engineering