Schedule a 30-minute technical evaluation on your plant data.
Meet directly with an operations research engineer. Bring your changeover logs, routing trees, and shift calendars — we will configure a live CP-SAT model of your primary bottleneck line in real time.
What happens next
30-MIN PROTOCOLPre-call data sanity check
Upload or email your sample shift workbook, routing table, or SKU matrix (.xlsx, .csv, or SAP export). Our industrial modeling team parses asset constraints within 24 hours.
30-min live solver configuration
We walk through your live bottleneck line on an interactive Gantt canvas. We simulate a machine stoppage, trigger sequence-dependent washdowns, and re-solve in <60 seconds.
Deterministic feasibility report
Receive a quantified comparative scorecard: changeover loss reduction (-34% avg benchmark), throughput recovery, and capital payback timeframe.
Industrial scheduling data contains proprietary formulations, capacity bottlenecks, and margin structures. We treat client workbooks as Tier-0 cryptographic assets.
“In our 30-minute technical evaluation, Cadence ingested our exact 42-SKU beverage canning matrix. Within 40 seconds, it identified an unexploited staging sequence that eliminated 3.8 hours of allergen washdowns every single week.”
Workbook & Data Ingestion Standards
Sequence-Dependent Cleanings
Pairwise changeover duration arrays between allergens, pack formats, or flavors. If you do not have a formal matrix, our parser auto-reconstructs historical changeover deltas from MES shift logs.
Multi-stage Asset Allocations
Inter-machine routing constraints (e.g. Cooker A feeding Holding Tanks 1–4, routed into Fillers 1 or 2). Cadence models both discrete assembly and continuous liquid transfer networks.
Secondary Resource Limitations
Operator availability by shift tier, specialized tooling dies, or sterilization skid contention. The CP-SAT solver accounts for shared secondary labor to prevent unexecutable plans.
